EMS customer update · October 2026 · No. 5

What's new in your EMS

Our busiest month yet: tariffs you can browse, costs you can drill into site by site, landlord billing you can check line by line, and metering held to the South African standard.

12releases in Octoberv0.2.21 → v0.2.29
Headline feature

Tariff Structures: browse any Eskom or municipal tariff in four steps

Choose Eskom or a municipality, the tariff period and the tariff type — and see every rate cell, season and time-of-use band. Energy components are labelled exactly as your supplier bills them, and each tariff screen loads in a fraction of the time.

  1. Eskom or municipality
  2. Tariff period
  3. Tariff type
  4. Full detail
166Municipalities
1,921Municipal tariffs
48Eskom tariff books

Variable Charges, site by site

  • Open any site into its full charge breakdown; consumption shows for every metered site.
  • Distributor-billed sites show their own charges — the site total is energy plus charges.
  • New feed-in credit (export) row where you generate.
  • The season tab opens on the month you are viewing.

Landlord & property-company billing

  • Record who bills each service — Eskom, municipality or landlord — per premises.
  • Capture the landlord's rate schedule as printed; the Supply section shows its status at a glance.
  • Costs are priced on the approved schedule and your measured quantities; undercharges on the landlord's bill are highlighted, never silently corrected.
  • Expected recharge statement per premises and month — a shadow document to check the real one against.

Metering compliance: NRS 057 & the Distribution Metering Code

  • NRS 057 (SANS 474) and the Distribution Metering Code adopted as binding references for every metering calculation.
  • A 40-clause compliance register, kept in the platform, with the status of each clause.
  • First remediation live: billing demand per NRS 057 — kVA as the vector sum, energy and power never sharing a unit, the four quadrants kept apart. More tranches follow.

Clearer charts and site views

  • Every chart now has a crosshair that snaps to the nearest point and reads out its values.
  • The wire diagram reads in kWh and draws one site at a time.
  • Energy-mix days and meter snapshots say how complete the data delivery was.
  • The node picker shows your full hierarchy, and every meter carries a name.
  • Load-shedding shows stage history and how much of it was actually observed.

Bill inbox

  • See every supplier bill as it enters intake, and where it stands, directly in the EMS.
  • Groundwork laid for bill assurance: exceptions against your own thresholds, surfaced in one queue.
  • “Open in Invoicing” hands you to Invoicing in your tenant and brings you back to the same screen.

The tariff engine behind it all

  • The NERSA 2026/27 municipal book — 7,801 charge lines across 166 distributors — now sits in the platform's tariff catalogue, loaded in one audited import and reviewed under maker-checker.
  • Eskom Megaflex, Miniflex and Ruraflex across every transmission zone and voltage band.
  • Every tariff carries its own time-of-use hours and, where a municipality uses them, kWh-block ladders — so what you see priced is what your supplier prices.
Also in October

Your logo, your EMS — upload or replace your company logo yourself.

E-mail notifications — are live from the platform, sent from within the region.

Dates in your time zone — site changes are stamped on the Johannesburg date.

Questions or feedback? Write to info@iep-global.com or contact your IEP account manager.